Running the round
How to split a recurring round across two vans
Split a recurring round across two vans by considering capacity, service requirements, access and equipment, then assigning visits visibly.

The short answer
Split a recurring round across two vans by considering capacity, service requirements, access and equipment, then assigning visits visibly.
Split a recurring round across two vans by considering capacity, service requirements, access and equipment, then assigning visits visibly. Geographical grouping can help planning, but a short route is not automatically a feasible working day.
Explore the wider recurring work inside the crm guides for the steps around this decision.
An allocation worksheet
| Visit group | Check before assigning |
|---|---|
| Nearby repeat sites | Actual durations and travel |
| Time-constrained site | Agreed access or appointment |
| Equipment-dependent work | Which van carries the resource |
| Deferred visit | Why it moved and what happens next |
| One-off addition | Scope, crew skill and remaining capacity |
Avoid double-allocating a shared machine or assigning a two-person task to a crew whose capacity assumes one available person.
An illustrative two-van day
Van A starts at a site with a confirmed access window and then works nearby visits. Van B carries equipment needed for a larger job. The office checks person-hours and travel before moving a deferred visit onto either list.
If one crew finishes early, check that reassigned work is visible in the right field view and that the customer arrangement still holds. Record the actual visit outcome, rather than creating a duplicate completed record.
JobDiary’s operating origin includes two vans, but this illustration is not a measured efficiency result from that business. The product supports scheduling and practical route planning; it does not promise universal automatic optimisation.
Review the completed day for realistic future allocations. Keep missed, moved and cancelled visits separately identifiable so the next repeat and payment record are not based on work that never happened.
Connect this to the next step
Continue with Weekly vs fortnightly mowing contracts: crew capacity and job margin. If the next issue is elsewhere in the workflow, use How to reschedule work after rain without losing jobs.
See the JobDiary product tour to check how the product supports this work. Use the current product description and a trial to verify the fit for your business.
When it is in JobDiary.
The method above is the point. This is what it looks like when the diary is doing it for you.
See how it works| Time | Job | Status |
|---|---|---|
| 08:30 | 7 The GreenMow, edge, hedge | Done |
| 09:15 | 23 Seabury DriveMow, weed | Done |
| 10:00 | 9 Brookfield LawnMow, feed | In progress |
| 11:05 | 12 Castle ParkMow, hedge rear | Next |
| 12:00 | 31 Church RoadMow | Scheduled |
| 13:15 | 18 The RiseMow, edge, bins out | Scheduled |
Product screens use demonstration data.
What this guide is based on
JobDiary was developed around a real Co. Louth trades operation with2 vans and live business records since 2025. This guide provides an editorial framework; worked examples are illustrative. Product screenshots use demonstration data.